How much government money does your project qualify for?
Estimate the total subsidy your Indian business is eligible to claim across central + state schemes — with anti-double-dipping rules applied so the headline number reflects what you can actually stack.
Estimate your subsidy
Where the money comes from.
Each scheme has its own eligibility rules, application path, and anti-double-dipping constraints. Schemes flagged INCLUDED IN TOTAL are the ones combined into the headline above. Schemes flagged ALTERNATIVE conflict with one already included — you'd pick one or the other.
How the total is computed. The estimator applies the main anti-double-dipping rules — PMEGP cannot stack with CLCSS or with ODOP-UP margin money for the same unit; central and state capital subsidies sometimes stack, sometimes don't depending on scheme guidelines and unit details. The headline is the maximum legal stack we can compute from your inputs. An advisor confirms the actual stack and files for it.
How subsidies are calculated
Most Indian government subsidies fall into three families: margin-money grants (PMEGP, ODOP UP) — a % of project cost adjusted against your bank loan after a lock-in period; capital subsidies (CLCSS, state schemes) — a % of plant and machinery cost paid out after commissioning; and interest subventions (Aatmanirbhar Gujarat) — the government pays part of your loan interest each year.
The estimator computes the rupee value of each based on scheme rules currently published. State-level interest subventions are quantified as a one-time-equivalent assuming a 5-year loan tenure for comparability.
• Urban · General: 15% of project cost
• Urban · Special category: 25%
• Rural · General: 25%
• Rural · Special category: 35%
"Special category" = women, SC/ST, OBC, minorities, ex-servicemen, differently-abled, NER.
Why stacking rules matter
If you naively sum every scheme you match for, you'll dramatically overstate your subsidy. The big anti-double-dipping rules in current MSME funding:
- PMEGP cannot be combined with CLCSS or with ODOP-UP margin money for the same unit.
- CLCSS is upgrade-only — for new units choose PMEGP or a state new-unit subsidy instead.
- State capital subsidies typically stack with CGTMSE (which is a guarantee, not a subsidy) and with central interest subventions, but not with central capital subsidies for the same fixed-asset line item.
- SISFS (Startup Seed Fund) is for DPIIT-recognised startups only and follows separate rules.
PMEGP and ODOP-UP both target margin money for the same unit — you pick the higher. PMEGP wins at ₹5L. UP MSME Policy capital subsidy is on a different line item and may stack — net stackable ₹8L (~40%).
Subsidy questions, answered
Are these estimates guaranteed amounts?
Can I really claim multiple subsidies for the same project?
How is the PMEGP subsidy actually disbursed?
Does CLCSS apply to my industry?
How long does subsidy approval take?
What documents do I need to claim these subsidies?
Estimate is just the start.
The headline number above is the legal max stack our model can compute from your inputs. An advisor confirms eligibility, files the applications and pursues the disbursement — end-to-end.
Get Your Stack Verified →